2.0 Project Procedures

Contains project related procedures, related documents and templates to be utilized by the design professional.
(Click here to report a broken or missing link)

Section Number Section Name View Guideline Managed By Last Updated Previous Version Comments Keywords
2.1 OPR and BOD (Owner's Project Requirements and Basis of Design) UM AEC Jun 2018 May 2012 0 -
2.2 Design Deliverables UM AEC Mar 2021 Feb 2021 0 -
2.3 UM Owner's Review UM AEC Dec 2014 Oct 2019 0 -
2.4.1 UMHS - Drawing and Construction Document Standards UMHS FPD Nov 2011 Jun 2010 0 -
2.5.1 UMHS - Project Estimates UMHS FPD Mar 2008 None 0 -
2.6 Insurance Underwriter UM AEC Jan 2015 None 0 -
2.7 Effective Date UM AEC NA None 0 -
2.8 Project Manual UM AEC Oct 2020 None 0 -